{"id":274737,"date":"2025-08-07T13:00:00","date_gmt":"2025-08-07T11:00:00","guid":{"rendered":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/?p=274737"},"modified":"2025-08-07T14:50:16","modified_gmt":"2025-08-07T12:50:16","slug":"mazon-finalitzem-la-reparacio-duna-vintena-dinstallacions-recreatives-afectades-per-les-riuades-despres-duna-inversio-de-mes-de-2-milions-deuros","status":"publish","type":"post","link":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/mazon-finalitzem-la-reparacio-duna-vintena-dinstallacions-recreatives-afectades-per-les-riuades-despres-duna-inversio-de-mes-de-2-milions-deuros\/","title":{"rendered":"Maz\u00f3n: \u201cFinalitzem la reparaci\u00f3 d&#8217;una vintena d&#8217;instal\u00b7lacions recreatives afectades per les riuades despr\u00e9s d&#8217;una inversi\u00f3 de m\u00e9s de 2 milions d&#8217;euros\u201d"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">Assenyala que l&#8217;objectiu \u00e9s \u201crestituir i posar en funcionament aquestes \u00e0rees, fonamentals perqu\u00e8 els ciutadans puguen gaudir dels paratges naturals, en el menor temps possible\u201d.<\/h3>\n\n\n\n<h3 class=\"wp-block-heading\">Trasllada que \u201cs&#8217;han recuperat un total de 278 quil\u00f2metres de senderes i es preveu que els treballs finalitzen al novembre del 2025\u201d.<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">El president de la Generalitat, Carlos Maz\u00f3n, ha destacat que \u201chem finalitzat la reparaci\u00f3 d&#8217;una vintena d&#8217;instal\u00b7lacions recreatives afectades per les riuades despr\u00e9s d&#8217;una inversi\u00f3 de m\u00e9s de 2 milions d&#8217;euros\u201d.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Aix\u00ed, les principals zones d&#8217;esbarjo en terreny forestal es troben obertes i s&#8217;han reparat a trav\u00e9s de les unitats de gesti\u00f3 forestal, que s&#8217;encarreguen del manteniment d&#8217;aquestes instal\u00b7lacions durant tot l&#8217;any.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">El cap del Consell ha assenyalat que \u201cel nostre objectiu ha sigut restituir i posar en funcionament aquestes \u00e0rees per a tornar a poc a poc a la normalitat en el menor temps possible\u201d i ha subratllat que \u201caquestes instal\u00b7lacions s\u00f3n fonamentals perqu\u00e8 els ciutadans puguen gaudir dels paratges naturals\u201d.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cal recordar que en una part d&#8217;aquestes zones els danys van ser puntuals, \u00e9s a dir de f\u00e0cil reparaci\u00f3, com la caiguda d&#8217;arbratge sense afectaci\u00f3 a les infraestructures, xicotets arrossegaments de terra o despreniments de roques. No obstant aix\u00f2, una altra gran part d&#8217;infraestructures van patir danys m\u00e9s severs, per la qual cosa, per a la seua recuperaci\u00f3, es va tramitar un contracte d&#8217;emerg\u00e8ncia amb un import total de 2.093.106,94 euros.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En una primera fase els treballs s&#8217;han centrat en cobrir els principals danys com a grans arrossegaments i aterramientos, xaragalls, infraestructures plenes d&#8217;arena, terra i restes vegetals, taules trencades o desaparegudes, danys en la captaci\u00f3 d&#8217;aigua, trencament d&#8217;escomeses d&#8217;aigua, danys en edificacions, accessos tallats, danys en murs de subjecci\u00f3 del terreny. &nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Maz\u00f3n ha assenyalat, aix\u00ed mateix, que quasi la totalitat de les actuacions estan finalitzades mancant rematades en diferents instal\u00b7lacions, per la qual cosa el Consell fa un pas m\u00e9s en el proc\u00e9s de recuperaci\u00f3 de les zones afectades perqu\u00e8 els valencians puguen gaudir ja d&#8217;aquestes zones recreatives.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Recuperaci\u00f3 de senderes<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">D&#8217;altra banda, s&#8217;ha estat treballant en la reparaci\u00f3 de les senderes de gran recorregut (GR 7 i GR 10) i el Cam\u00ed Natural del T\u00faria-Cabriol -al seu pas per la prov\u00edncia de Val\u00e8ncia-, en els quals es van produir arrossegaments, aterramientos i xaragalls en el ferm, danys en la senyalitzaci\u00f3 (pals, paletes, balises, panells informatius i desaparici\u00f3 de les marques de pintura), principalment en els encreuaments de rius, rambles i barrancs. Cal destacar la desaparici\u00f3 del pont penjant sobre el riu T\u00faria a Benaixeve.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En les pr\u00f2ximes setmanes continuar\u00e0 la recuperaci\u00f3 de les senderes de gran recorregut GR 7 i GR 10 va m\u00e9s retardada, a causa de l&#8217;elevat nombre d&#8217;incid\u00e8ncies aparegudes, pel retard en els subministraments i principalment, i per la reparaci\u00f3 del pont penjant sobre el riu T\u00faria, a Benaixeve.&nbsp;<br>Maz\u00f3n ha traslladat que \u201cs&#8217;han recuperat ja un total de 278 quil\u00f2metres de senderes i es preveu que els treballs finalitzen al novembre del 2025 i aix\u00ed marcar una fita m\u00e9s en la reconstrucci\u00f3 de la prov\u00edncia de Val\u00e8ncia\u201d.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"762\" height=\"1024\" data-id=\"274732\" src=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion02-762x1024.png\" alt=\"\" class=\"wp-image-274732\" srcset=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion02-762x1024.png 762w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion02-223x300.png 223w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion02-768x1032.png 768w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion02.png 1011w\" sizes=\"auto, (max-width: 762px) 100vw, 762px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"762\" height=\"1024\" data-id=\"274734\" src=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion03-762x1024.png\" alt=\"\" class=\"wp-image-274734\" srcset=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion03-762x1024.png 762w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion03-223x300.png 223w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion03-768x1032.png 768w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2025\/08\/MazonReconstruccion03.png 1011w\" sizes=\"auto, (max-width: 762px) 100vw, 762px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">Assenyala que l&#8217;objectiu \u00e9s \u201crestituir i posar en funcionament aquestes \u00e0rees, fonamentals perqu\u00e8 els ciutadans puguen gaudir dels paratges naturals, en el menor temps possible\u201d. Trasllada que \u201cs&#8217;han recuperat un total de 278 quil\u00f2metres de <a class=\"mh-excerpt-more\" href=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/mazon-finalitzem-la-reparacio-duna-vintena-dinstallacions-recreatives-afectades-per-les-riuades-despres-duna-inversio-de-mes-de-2-milions-deuros\/\" title=\"Maz\u00f3n: \u201cFinalitzem la reparaci\u00f3 d&#8217;una vintena d&#8217;instal\u00b7lacions recreatives afectades per les riuades despr\u00e9s d&#8217;una inversi\u00f3 de m\u00e9s de 2 milions d&#8217;euros\u201d\">[+] <\/a><\/div>\n","protected":false},"author":13,"featured_media":274731,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"gallery","meta":{"footnotes":""},"categories":[11041,10892,21466,11046,10898,10948,10894,10904,10903,10947,10896,10897],"tags":[18807,15409,12903,11199,11140],"class_list":["post-274737","post","type-post","status-publish","format-gallery","has-post-thumbnail","category-benageber-ca","category-camp-de-turia-ca","category-dana-ca","category-los-serranos-ca","category-ventana-ca","category-infraestructuras-ca","category-la-comarca-ca","category-sin-categorizar-ca","category-medio-ambiente-la-comarca-ca","category-politica","category-seccion-ca","category-sucesos-la-comarca-ca","tag-carlos-mazon-ca","tag-dana-2-ca","tag-infraestructuras-ca","tag-la-comunitat-ca","tag-politica-ca","post_format-post-format-gallery"],"_links":{"self":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts\/274737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/comments?post=274737"}],"version-history":[{"count":0,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts\/274737\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/media\/274731"}],"wp:attachment":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/media?parent=274737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/categories?post=274737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/tags?post=274737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}