{"id":290636,"date":"2026-01-19T11:30:00","date_gmt":"2026-01-19T10:30:00","guid":{"rendered":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/?p=290636"},"modified":"2026-03-12T00:09:19","modified_gmt":"2026-03-11T23:09:19","slug":"la-generalitat-afronta-la-fase-final-de-la-reconstruccio-de-les-passarelles-de-sot-de-chera-despres-de-concloure-un-trasllat-complex","status":"publish","type":"post","link":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/la-generalitat-afronta-la-fase-final-de-la-reconstruccio-de-les-passarelles-de-sot-de-chera-despres-de-concloure-un-trasllat-complex\/","title":{"rendered":"La Generalitat afronta la fase final de la reconstrucci\u00f3 de les passarel\u00b7les de Sot de Chera despr\u00e9s de concloure un trasllat complex"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\">L\u2019estructura s\u2019ha dividit en tres parts per a poder travessar el nucli urb\u00e0 i, una vegada en l\u2019empla\u00e7ament, s\u2019han iniciat els treballs d\u2019acoblament\u00a0in situ.<\/h3>\n\n\n\n<h3 class=\"wp-block-heading\">Est\u00e0 previst que la col\u00b7locaci\u00f3, que ha millorat la seguretat i resili\u00e8ncia despr\u00e9s de quedar arrasades les anteriors amb les riuades, finalitze a principis de febrer.<\/h3>\n\n\n\n<p>La Vicepresid\u00e8ncia Tercera i Conselleria de Medi Ambient, Infraestructures, Territori i de la Recuperaci\u00f3 ha completat el trasllat en fases pel nucli urb\u00e0 de les estructures met\u00e0l\u00b7liques de les noves passarel\u00b7les que s\u2019instal\u00b7laran a Sot de Chera en el marc dels processos de reconstrucci\u00f3 despr\u00e9s de les riuades que van arrasar les anteriors passarel\u00b7les.<\/p>\n\n\n\n<p>El trasllat de les estructures ha estat condicionat per les dificultats d\u2019acc\u00e9s a l\u2019obra, ja que el transport s\u2019ha fet a trav\u00e9s del nucli urb\u00e0 de la poblaci\u00f3. Per este motiu, la passarel\u00b7la s\u2019ha traslladat en diferents parts i, una vegada en l\u2019empla\u00e7ament, s\u2019han iniciat els treballs d\u2019acoblament&nbsp;<em>in situ<\/em>, com a pas previ a l\u2019hissat i a la seua col\u00b7locaci\u00f3 definitiva.<\/p>\n\n\n\n<p>La nova passarel\u00b7la del carrer Ram\u00f3n y Cajal-Cam\u00ed Cementeri est\u00e0 composta per dos arcs met\u00e0l\u00b7lics de 22,8 metres de llum, amb un ample \u00fatil de tres metres, i ha sigut fabricada en acer Corten, que \u00e9s resistent a la corrosi\u00f3. Aix\u00ed mateix, el disseny de la nova estructura permet salvar el riu sense suports intermedis, la qual cosa incrementa de manera significativa la seua capacitat hidr\u00e0ulica.<\/p>\n\n\n\n<p>A m\u00e9s, la setmana passada es va rebre l\u2019estructura met\u00e0l\u00b7lica de la passarel\u00b7la del Cerrao, de la mateixa tipologia constructiva i amb una llum de 18 metres. En este cas, l\u2019estructura va arribar en dos parts i es troba actualment en fase final d\u2019acoblament. Est\u00e0 previst que l\u2019acoblament complet i la col\u00b7locaci\u00f3 de les dos passarel\u00b7les es duguen a terme a principis del mes de febrer.<\/p>\n\n\n\n<p><strong>Pont de la Tejer\u00eda<\/strong><\/p>\n\n\n\n<p>Les inundacions no solament van afectar el pont d\u2019acc\u00e9s al cementeri, la passarel\u00b7la per als vianants que connecta els carrers Pocillo i Pedregal amb el passeig Fuente T\u00edo Fausto i paratge el Cerrao, sin\u00f3 tamb\u00e9 el pont de la Tejer\u00eda. Este pont \u00e9s una infraestructura essencial per a la mobilitat local que va quedar inservible per al tr\u00e0nsit, per la qual cosa s\u2019est\u00e0 reconstruint i adaptant per a resistir fen\u00f2mens meteorol\u00f2gics extrems.<\/p>\n\n\n\n<p>El nou disseny, de 40 metres de longitud i 10,5 metres d\u2019ampl\u00e0ria, comptar\u00e0 amb dos carrils de circulaci\u00f3 i una vorera per a vianants. A m\u00e9s, incorporar\u00e0 millores clau en la protecci\u00f3 de fonamentacions i en la restituci\u00f3 del llit.<\/p>\n\n\n\n<p>Estes actuacions formen part de les 57 obres locals que ha assumit la Generalitat dins del pla Endavant, despr\u00e9s de rebre la cessi\u00f3 de compet\u00e8ncies dels ajuntaments afectats, la qual cosa ha perm\u00e9s agilitar la seua execuci\u00f3. En este pla s\u2019afronta la fase final despr\u00e9s de materialitzar la major part de les actuacions i una inversi\u00f3 que supera els 50 milions d\u2019euros.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-290631\" srcset=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-1024x768.jpeg 1024w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-300x225.jpeg 300w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-768x576.jpeg 768w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-1536x1152.jpeg 1536w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-678x509.jpeg 678w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-326x245.jpeg 326w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1-80x60.jpeg 80w, https:\/\/www.tucomarca.com\/wordpress\/segunda\/wp-content\/uploads\/2026\/01\/SotdeChera2-1.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">L\u2019estructura s\u2019ha dividit en tres parts per a poder travessar el nucli urb\u00e0 i, una vegada en l\u2019empla\u00e7ament, s\u2019han iniciat els treballs d\u2019acoblament\u00a0in situ. Est\u00e0 previst que la col\u00b7locaci\u00f3, que ha millorat la seguretat i <a class=\"mh-excerpt-more\" href=\"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/la-generalitat-afronta-la-fase-final-de-la-reconstruccio-de-les-passarelles-de-sot-de-chera-despres-de-concloure-un-trasllat-complex\/\" title=\"La Generalitat afronta la fase final de la reconstrucci\u00f3 de les passarel\u00b7les de Sot de Chera despr\u00e9s de concloure un trasllat complex\">[+] <\/a><\/div>\n","protected":false},"author":1,"featured_media":290634,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21466,11046,10898,10948,10894,10904,10903,10947,10896,11026,10897],"tags":[21789,11928,11080,17643],"class_list":{"0":"post-290636","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-dana-ca","8":"category-los-serranos-ca","9":"category-ventana-ca","10":"category-infraestructuras-ca","11":"category-la-comarca-ca","12":"category-sin-categorizar-ca","13":"category-medio-ambiente-la-comarca-ca","14":"category-politica","15":"category-seccion-ca","16":"category-sot-de-chera-ca","17":"category-sucesos-la-comarca-ca","18":"tag-generalitat-ca","19":"tag-la-serrania-ca","20":"tag-los-serranos-ca","21":"tag-sot-de-chera-ca"},"_links":{"self":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts\/290636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/comments?post=290636"}],"version-history":[{"count":0,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/posts\/290636\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/media\/290634"}],"wp:attachment":[{"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/media?parent=290636"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/categories?post=290636"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.tucomarca.com\/wordpress\/segunda\/ca\/wp-json\/wp\/v2\/tags?post=290636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}